Skip to content
HistoriathekFilm & photo archive
0:00 / 0:00

Penstocks of a hydroelectric power station, 1937

Beneath the steel lattice of a high-voltage pylon, a bank of six huge riveted pipes runs straight down a wooded mountainside; in close view the penstocks pass through a massive concrete anchor block and continue downhill side by side. The pipes resemble those of the Walchensee power station in Upper Bavaria, which Oskar von Miller completed in 1924 and which dropped the water of a mountain lake some 200 metres to its turbines.

Period
c. June 26, 1937–October 8, 1937
Credit
Julien BryanLibrary of CongressDigitalisierung und Bearbeitung: © zb Media GmbH

Part of

Keywords

Specifications

Clip name
HFE026755
Length
0' 13"
Aspect Ratio
0:1
Frames per Second
24 fps
Chroma Subsampling
yuv422p10le
Resolution
1920 × 1080
Format
MOV
File Size
291,502,162 bytes
Select License