0:00 / 0:00
Diagram: structural steel reaches the 50th story
The glowing drawing of the building has grown: above the stepped base the shaft is outlined in bright lines up to its halfway point, the frame shown open at the top, and an arrow points to it beside the lettering August 1st. Structural steel reaches the 50th story.
- Period
- c. August 1, 1930–1931
- Credit
- US National ArchivesPublic Domain (NARA) · Digitalisierung und Bearbeitung: © zb Media GmbH
Specifications
- Clip name
- HFE004438
- Length
- 0' 07"
- Aspect Ratio
- 16:9
- Frames per Second
- 24 fps
- Chroma Subsampling
- yuv422p10le
- Resolution
- 1920 × 1080
- Format
- MOV
- File Size
- 158,357,380 bytes