0:00 / 0:00
Steel plate is shaped in the pipe plant
A long machine of riveted steel girders stretches away with a row of heavy clamps and presses along its underside, gripping the edge of a thick steel plate; at its end a worker in pale overalls and a cap stands at the control wheel. The steel pipes for the dam, up to nine metres across, were too large to be shipped by rail and were made in a fabrication plant built near the site, as the source notes.
- Period
- c. 1933–1935
- Credit
- US National ArchivesPublic Domain (NARA) · Digitalisierung und Bearbeitung: © zb Media GmbH
Specifications
- Clip name
- HFE004105
- Length
- 1' 38"
- Aspect Ratio
- 16:9
- Frames per Second
- 24 fps
- Chroma Subsampling
- yuv422p10le
- Resolution
- 1920 × 1080
- Format
- MOV
- File Size
- 2,169,538,148 bytes