0:00 / 0:00
The dry floor of the canyon at the dam site
The riverbed between the canyon walls has been drained and dug out; terraces and ramps of pale rubble step down across the site, a pipeline runs along the far slope, and a small hut with a window stands in the foreground at the edge of the excavation, the dark cliffs rising behind.
- Period
- c. 1932–1933
- Credit
- US National ArchivesPublic Domain (NARA) · Digitalisierung und Bearbeitung: © zb Media GmbH
Specifications
- Clip name
- HFE004080
- Length
- 0' 29"
- Aspect Ratio
- 16:9
- Frames per Second
- 24 fps
- Chroma Subsampling
- yuv422p10le
- Resolution
- 1920 × 1080
- Format
- MOV
- File Size
- 633,645,380 bytes